This is the first house we’re working on and we’re really excited to show our progress.
The outside of the home had several holes and those have been repaired, a new soffit and seamless guttering put on. The house was then repainted. The front deck was falling down and the cement could not be lifted so a new deck was built with a safety railing to prevent falls.
While all this is happening, the inside is being gutted and a wall changed to a half wall to open up the home. Electricity is being updated to include usb ports on the outlets.